HUDSON BOILER & TANK COMPANY
STEEL FABRICATORS AND ERECTORS

Click on each picture to expand!
STACK WORK
| PROJECT |
LOCATION AND/OR OWNER |
Seven (7) Lined Boiler Stacks |
Chicago O'Hare Airport Heating & Refrigeration Building, Chicago, IL |
Stainless Steel Stack Liner - 50 Story Building |
One East Wacker Drive Building, Chicago, IL |
6'-0" dia. x 125'-0" Lined Stack Installation |
Comed's Dresden Nuclear Power Station, Morris, IL |
Incinerator Stack & Breechings Installation |
Ingalls Memorial Hospital, Harvey, IL |
Incinerator Stack & Breechings Installation |
St. Joseph's Hospital, Chicago, IL |
Boiler Stack Installation |
Metropolitan Sanitary District of Greater Chicago, Chicago & Stickney, IL |
Boiler Stack Installation |
Lucent Technologies, Naperville, IL |
Boiler Stack Installation |
 Union Station Powerhouse, Chicago, IL |
Boiler Stack Installation |
Unichema North America, Chicago, IL |
|
TANK WORK
| PROJECT |
LOCATION AND/OR OWNER |
Reaction Tank Fabrication and Installation - (2) - ASME Vessels, 24'-0" dia. x 25'-0" high |
Water Reclamation District of Greater Chicago - Stickney Water Reclamation Plant, Stickney, IL |
Fabricate and Erect Two (2) - 20'-0" dia. x 24'-0" High Product Tanks |
Prestone Products, Alsip, IL |
Fabricate and Erect ASME Hot Process Softener and Replace 22'-0" dia. x 38'-0" high Waste Ammonia Tank |
LTV Steel Co., Chicago Coke Plant, Chicago, IL |
Fabricate and Erect ASME Hot Process Softener |
Acme Steel Co., Chicago Furnace Plant, Chicago, IL |
Fabricate and Erect 34'-0" dia. x 24'-0" High Oil Tank |
General Mills, Inc., Chicago, IL |
Fabricate and Erect (8) Hydrofluosilic Acid Tanks |
Jardine Water Purification Plant, Chicago, IL |
Stainless Steel Tank, 35'-0" dia. x 36'-0" high |
Unichema North America, Chicago, IL |
Stainless Steel Tank, 25'-0" dia. x 36'-0" high |
 American Maize Co., Hammond, IN |
|
BOILER REPAIR WORK
| PROJECT |
LOCATION AND/OR OWNER |
Retube Boilers 1 thru 4 |
Great Lakes Naval Training Center, Great Lakes, IL |
Retube #4 Foster Wheeler Boiler |
E.J. Brach & Sons, Chicago, IL |
Boiler Repairs & Modifications; Miscellaneous Maintenance & Repair work |
Comed, Chicago, IL |
Replace Superheater Tubes - Turbo Blower House Boiler |
USX Corp., Gary, IN |
Retube Pacific Fire Tube Boilers |
Holy Name Cathedral, Chicago, IL |
Replace Economizer and Boiler Repairs |
Illinois Institute of Technology, Chicago, IL |
Boiler Erection |
 R.R. Donnelley |
|
MISCELLANOUS WORK
| PROJECT |
LOCATION AND/OR OWNER |
Engine and Waste Heat Recovery Boiler Intake & Exhaust Ducts, Service Water Storage Tanks - Cogeneration Facility |
University of Illinois at Chicago, Chicago, IL |
Duct Support Fabrication and Installation |
U.S. Tobacco Co., Franklin Park, IL |
Blast Furnace Stove Connections - Fabricate & Erect, Retube Turbo Condenser, BOF Duct Modifications |
Acme Steel Co., Chicago and Riverdale, IL |
Erect Heat Recovery Steam Generating System and Air Cooled Condensers - Cogeneration Facility |
Mallard Lake Landfill Project, Hanover Park, IL |
Fabricate and Install New Pipe Coils in Hydrogenation Vessel |
Vanden Bergh Foods Co., Joliet, IL |
Erect Dust Collection System |
Robbins Resource Recovery Plant, Robbins, IL |
Baghouse and Duct Installations |
  SIPI Metals, Inc. |
|

Copyright © 1997, CyberSpiders Inc.